We are integrators: we design, coordinate and commission turnkey charging stations and energy systems — DC chargers, electrical infrastructure, BESS, solar generation and smart energy management, under a single accountable counterpart.
Photo: SigenergyDesign, technical specification, supply and contractor coordination, commissioning and handover — with us as the single counterpart.
Photo: SigenergyEverything that happens after the substation or the grid's transformer: low-voltage switchboards, protections, conduits, cabling and metering down to each charging point.
Photo: SigenergyPhotovoltaic generation, energy storage and peak shaving to cut demand charges and avoid unnecessary grid connection upgrades.
Photo: Sigenergy — Sigen Energy GatewayAC chargers, DC Fast Chargers and HPC, selected against real usage profile, available power and fleet or end-customer type — not against a manufacturer's catalog.
Photo: DarkEnergyEMS, OCPP protocol, remote monitoring, power control and load management, to operate multiple stations without exceeding contracted capacity.
Photo: SigenergyStructuring of maintenance and long-term service agreements, including availability and response levels.
These are not mandates delivered by Consultora Ruta Maestra: they are real installations by Sigenergy — the BESS and energy-management technology manufacturer we specify — and by its Chile-based integrator, DarkEnergy. We include them as evidence that the equipment we recommend is proven in the field, from residential installations to utility-scale projects.
Photo: DarkEnergySingle-phase system with 8 kW output and 36 kWh of storage, across 4 batteries of 9 kWh each.
Photo: DarkEnergyThree-phase system with 15 kW output and 27 kWh of storage, across 3 batteries of 9 kWh each.
Photo: DarkEnergyHybrid SigenStore + Sigen Hybrid system: an 8 kW SigenStore coupled at the Gateway with a 5 kW Sigen Hybrid (capped at 4 kW), for 12 kW total output and 27 kWh of storage across 3 batteries of 9 kWh each.
Photo: SigenergyThree-phase SigenStack system with 110 kW output and 252 kWh of storage, across 21 batteries of 12 kWh each. Goal: a 100% renewable campus with a $0 monthly electricity bill target.













Professional Software
Proprietary software tools for photovoltaic design, BESS storage, technical visits and commissioning.
v1.1 — Available
PV+BESS design, branded PDF reports, free trial.
Coming Soon
Coming Soon
Coming Soon
We don't manufacture equipment or run our own construction crews. We select the right technology, structure the contract, direct the engineering and take responsibility for full commissioning. The technical and commercial judgment behind every decision comes from our team's cumulative track record in large-scale projects.
Our technical team brings experience from five major BESS projects (up to 200 MW / 800 MWh), covering engineering, supply chain, commissioning and long-term service agreements (LTSA >20 years).
We apply strategic procurement discipline with over USD 300M in managed spend. That same rigor goes into evaluating chargers, transformers and storage equipment for every project.
Experience structuring the legal framework of BESS projects with EPC contracts, project finance and risk allocation across SPV, sponsors and lenders.
A single counterpart accountable for the full scope, with the technical, commercial and legal evaluation done before you commit capital — not three vendors blaming each other when something fails.
Initial diagnostic, detailed budget, financial modeling and three scenarios — see the full method →
We act as integrators: we do the engineering, technical specification, technology selection and project direction, and we coordinate the contractors and suppliers who execute. We're your single counterpart, and we tell you transparently who executes each part.
We have no exclusivity with any manufacturer. Selection is made against your usage profile and available power — that's precisely the judgment an integrator adds over a distributor.
It depends on the power rating and installation type, but as a general reference it's evaluated against RIC N°9.1/2021, RGR N°06/2024 and DS N°8/2020. We review it specifically for your case in the initial diagnostic.
Yes. The team has a track record of projects delivered in Chile, Argentina, Uruguay, Paraguay and Mexico, and that's the region where we assess engagements.
Fill out the initial diagnostic form and we'll respond directly within 24 hours.
Sergio Cerda Maluenda responds personally.
Assess a charging or energy project → 🌿 Discover Ruta Maestra Total Energy →